DUTIES AND FUNCTIONS OF THE DEVELOPER


From The Desk Of Shree.Mahendra Sawant
Architectural Head

The Developer to demolish the building existing in the plot and construct new multi storied buildings taking into account the earthquake resistant factors as directed by The Municipal Corporation of Greater Mumbai. The new building should have stilt for car parking and should consist of _____ stories as per approved plans. The final plans are to be prepared after due consultation with the managing committee and understanding their requirements.


The Developer shall be responsible to obtain all the necessary approvals from The Municipal Corporation of Greater Mumbai and all other statutory and Government offices and departments which will include:


• Development Planning Remark or Town Planning Remark:MCGM (Dev. Dept.)


• Survey of the entire plot with regards to the area and topography of the plot, existing plot boundary and existing structures (Developer’s Architect)


• Intimation of Disapproval (IOD): MCGM


• Property Tax Assessment NOC: MCGM (Assessment Department)


• Hydraulic Engineer No Objection Certificate: MCGM (Hydraulic Department)


• Storm Water Drainage No Objection Certificate: MCGM


• Sewerage No Objection Certificate: MCGM


• Traffic Deptt. of Municipal Corporation of Greater Mumbai No Objection Certificate: MCGM


• Urban Land Ceiling NOC: Competent Authority in Collector's Office


• Tree No Objection Certificate: MCGM (Tree Authority)


• Non-Agricultural Permission: Collector's Office


• Civil Aviation No Objection Certificate: Airport Authority of India


• Pest Control No Objection Certificate: MCGM (PCO)


• MTNL No Objection Certificate: MTNL


• Chief Fire Officer's No Objection Certificate: Fire Department Office


• Commencement Certificate: MCGM


• Lift Inspection No Objection Certificate: Inspector of Lifts, PW


• Occupation Certificate (OC):MCGM


• Water Connection Certificate under section 270A:MCGM


• Drainage Completion Certificate: MCGM (Water Department)


• Building Completion Certificate (BCC):MCGM


• TDR Loading: MCGM


• Building Demolition Work: Contractor appointed for demolition work


• Soil Testing Report:The Concerned Laboratory


Please ensure to collect all the listed certificates from the Developer/Developer as the same must be with the custody of the Housing Society once the redevelopment of the property is completed and the occupancy certificate is issued by MCGM to rehouse the members.